Best Western Hotel

New Hotel across 4 levels within a 5 minute walk to the Victoria market.
Daikin VRV Air conditioning.
Ventilation and bathroom exhaust throughout.

  • Completed: 2022
  • Engineer: NJM Engineering
  • Client: Ireland Brown Constructions

Enquire Now

All fields are required.